Hiring a contractor · Straight answers from the Alanis family

What should a written remodel quote include?

Key takeaways

  • A quote that fits on one page is not a quote, it is a number. The detail underneath the number is the part that protects you.
  • According to the Federal Trade Commission, a home improvement contract should carry the contractor's name, address, phone number and license number, an estimated start and completion date, and any promises made in conversation about scope and the cost of labor and materials. The FTC also says to "make sure all blank spaces are filled in."
  • Sales tax on a Texas remodel is not optional, but where it shows up is. According to the Texas Comptroller, "Labor to repair, remodel, or restore residential real property is not taxable," and whether materials tax appears as a line on your bid depends on how the contract is written.

The FTC's advice is to "Get multiple estimates." The trouble is that two or three bids are often impossible to compare. One is a single page with a number at the bottom. One is four pages with a materials list. One came as a text message. They are not really three prices for the same job, because nobody wrote down what the job is.

Alanis Remodeling & Construction is a family-owned remodeling company in Anna, Texas, working across Collin County and North Texas since 1999. Our proposals put the cost and the schedule in writing before work starts. Here is what should be on any bid you are handed, ours included.

What is the difference between an estimate, a bid and a contract?

An estimate is an educated guess given before anybody has measured. A bid is a firm price for a defined scope. A contract is the bid plus the terms, signed by both sides. The word on the paper matters less than whether the scope, the price, the dates and the terms are all written down.

The trouble starts when a homeowner treats an estimate like a bid. A number given at the curb after a ten minute look hasn't accounted for what's behind the walls, so ask which one you're holding, and if it's an estimate, ask what has to happen before it becomes a firm price.

Want a proposal you can actually compare? Request a free in-home estimate and we will walk the job before we put a number on it.

What should a remodel quote include before demo day?

The FTC says "A written estimate should include a description of the work to be done, materials, completion date, and the price." Every line below should appear on the document you sign. If one is missing, ask for it in writing rather than over the phone.

What to look forWhy it matters
Company name, physical address, phone, and license number where the trade is licensedThe FTC lists all four. A company with no address on its paperwork is hard to find later.
Scope of work, room by roomThis is the whole document. "Remodel kitchen" is not a scope.
What is specifically excludedThe gap between what you pictured and what was bid is where most disputes live.
Specific materials, brands and model numbers"Tile" is a word. A tile line with a product name is a commitment.
Allowances, with the amount statedAn allowance is a placeholder for a selection you have not made yet.
Start date and completion dateThe FTC lists an estimated start and completion date as contract content.
Payment schedule tied to stagesPayments should follow work completed, not the calendar.
Who pulls permits, and for whatThis changes by city across Collin County.
How change orders are priced and approvedIn writing, signed, before the work happens.
Cleanup, debris haul off and daily protectionSomebody is paying for the dumpster. It should say who.
Warranty on workmanship, and what voids itSeparate from any manufacturer warranty on materials.
Anything promised out loudThe FTC says conversation promises about scope and cost belong in the contract.

Why does sales tax look different on two Texas bids?

Because Texas taxes residential remodeling by how the contract is written, not by what the work is. According to the Texas Comptroller, "Labor to repair, remodel, or restore residential real property is not taxable." What varies is the treatment of materials.

There are two ways a contractor can write it:

  • A lump-sum contract gives one price for the whole job. The Comptroller's rule is that under a lump-sum contract, the contractor pays tax on supplies, materials and equipment when buying them, and "You don't charge your customer tax." So no tax line appears on your bid. The tax is still there, it is inside the number.
  • A separated contract breaks out labor and materials. The contractor buys materials for resale and then charges the customer tax on the materials portion. The Comptroller adds that the charge for materials "must be at least as much as you paid for them," and that "The construction labor charge is not taxable."

This is why one bid shows a tax line and another does not, and why comparing a lump-sum bid to the pre-tax subtotal of a separated bid makes the lump-sum look higher than it is. Ask each contractor which way their contract is written, then compare the bottom line to the bottom line.

Which license should I actually check?

The ones belonging to the trades, not the remodeler. Ask what "licensed and insured" on a bid refers to, because for a remodeler it often means insurance plus city registration. The plumber is different, because the state licenses plumbers and publishes the records.

Plumbing is the easiest one to check. According to the Texas State Board of Plumbing Examiners, you can enter a Responsible Master Plumber's license number in the board's license search to confirm the license is valid and that a certificate of insurance is on file. The board also points out that Master Plumber license numbers begin with the letter "M," and that numbers starting with "A," "T," "J" or anything else are not Master Plumber numbers.

So when a quote lists subcontractors, that list is useful. Ask for the names, then look them up yourself. It takes two minutes and tells you something no review can. Insurance is the other piece: ask for a certificate of liability insurance sent directly from the agency, not a photo of one.

What about allowances, the line that blows up budgets?

An allowance is a placeholder for something you have not picked yet, like tile, fixtures or countertops. It is normal and useful, and it causes more budget arguments than anything else on a remodel, because the allowance was set before you walked into the showroom.

Three questions to ask about every allowance on a quote:

  1. What does this allowance actually buy? An allowance for "flooring" should say whether it covers material only or material and labor.
  2. What happens if I go over? The answer should be written: you pay the difference, at cost or at cost plus a stated markup.
  3. What happens if I come in under? The answer should also be written. It should come back to you.

The cleanest way around allowance surprises is to make your selections before the contract is signed, so the line items carry real product names instead of placeholders.

What does this look like in Anna and Collin County?

One local thing changes what belongs on a quote here, and it's permits. Every Collin County city runs its own process, so who pulls the permit and what it covers has to be stated for your city, not for the county. We walk through how that plays out in do I need a permit for a kitchen remodel in Anna, TX.

Get a proposal you can compare

Book a free in-home estimate. We look at the actual job, put the scope, the cost and the schedule in writing before demo day. Bring this list to the walkthrough and ask every question on it. Kim, one of our Google reviewers, put it this way: "What impressed us most was their ability to complete the project not only on time but also within our budget."

See what we do on the services page, look at finished work in the project gallery, or request your free estimate and the Alanis family will schedule your walkthrough. Prefer to talk now? Call (214) 451-7499.

About the author

Angel Alanis is the project manager at Alanis Remodeling & Construction, the family company Jesus Alanis founded in Anna, Texas in 1999. He runs the schedule and the day to day communication on every kitchen, bathroom and whole-home remodel the family crew takes on across Collin County and the Dallas-Fort Worth area. Meet the family.

Questions, answered.

Should a remodel quote be free?

An in-home estimate for a remodel is often free, and ours is. Detailed design work, drawings and engineering are a different thing, and some companies bill for them. Ask which you're getting, and whether any of it is billed, so nobody is surprised by an invoice for a drawing.

Can I cancel after I sign?

Sometimes. According to the Federal Trade Commission, a contract should include a written statement of your right to cancel within three business days if you signed it in your home or somewhere other than the seller's permanent place of business. Read the cancellation language before you sign anything at your kitchen table.

How much should I pay up front?

The FTC's guidance is plain: do not pay the full amount for the project up front, and it notes that some states limit what a contractor can ask for as a down payment. A deposit that covers ordered materials is normal. A payment schedule tied to completed stages is what you want after that.

What is a change order?

A written, signed document that adds to or subtracts from the agreed scope and states what it does to the price and the schedule. Nothing should change on a verbal yes. If something turns up behind a wall, the contractor should tell you what was found and what it changes before work continues.

Does the quote need to list the crew?

It should at least name the subcontracted trades, because that is what lets you verify the plumber with the state. On our jobs the same family runs the work from start to finish, and you know who is coming.

Toda la familia habla español.

Visite nuestra página en español
Free Estimate

Get your price
in writing.

Tell us about your project and the Alanis family will schedule your free estimate. Prefer to talk now? Call us.

Free in-home estimate, no obligation
Upfront costs in writing, no hidden fees
Family crew, English and Spanish
Tap to call (214) 451-7499
What happens next
01We call to set a time that works
02Free walkthrough at your home
03Your price and schedule, in writing

$25,000 Guarantee. Every project we take on is backed by The Good Contractors List.

"Whatever your project, big or small, Jesus and Angel should be your 'I know a guy'."

Kyle Stephenson · Google Review

Tell the family about your project

Takes about a minute. The family reads every one.

Free Estimate